England Coast Path: overview of progress

09/10/2019 0 By wildfeed

Published 26 June 2014
Last updated 9 October 2019 + show all updates

  1. 9 October 2019 Map updated to show Marsland Mouth to Newquay stretch is now at stage 4.
  2. 3 October 2019 Map updated to show South Hayling to East Head is now at stage 4.
  3. 18 September 2019 Map updated to show Newport Bridge to North Gare is now open to the public and Penzance to St Mawes is now at stage 4.
  4. 31 July 2019 Map updated to show the Amble to Bamburgh stretch is now at stage 4.
  5. 25 July 2019 Map updated to show that the Aust to Brean Down stretch is now at stage 4.
  6. 17 July 2019 Map updated to show the Calshot to Gosport stretch is now at stage 4.
  7. 20 June 2019 Map updated to show that Newquay to Penzance, St Mawes to Cremyll and Gosport to Portsmouth stretches are now at stage 4.
  8. 5 June 2019 Map updated to show Grain to Woolwich stretch is now at stage 4.
  9. 27 February 2019 Map updated to show the Skegness to Mablethorpe stretch is now open to the public.
  10. 27 September 2018 Map updated to show Shoreham-by Sea to Eastbourne stretch is now at stage 4.
  11. 26 July 2018 Map updated to show that the South Bents to Amble stretch is now open to the public.
  12. 21 March 2018 Map updated to show Weybourne to Hunstanton stretch is now at stage 4.
  13. 14 March 2018 Map updated to show Highcliffe to Calshot stretch is now at stage 4.
  14. 28 February 2018 Map updated to show Easington to Filey Brigg stretch is now at stage 4.
  15. 25 January 2018 Map updated to show Maldon to Salcott stretch is now at stage 5.
  16. 24 January 2018 Map updated to show that the Sutton Bridge to Skegness stretch is now at stage 4.
  17. 27 November 2017 Map updated to show that Skegness to Mablethorpe and South Bents to Amble are now at stage 5.
  18. 27 September 2017 Map updated to show that East Head to Shoreham stretch is now at stage 4.
  19. 16 August 2017 Map updated to show Jaywick to Harwich stretch has reached stage 4
  20. 19 July 2017 Map updated to show that Burnham-on-Crouch to Maldon and Portsmouth to South Hayling stretches have reached stage 4.
  21. 30 June 2017 Map updated to show work has started on the Tilbury to Southend-on-Sea, Southend-on-Sea to Wallasea Island, Wallasea Island to Burnham-on-Crouch stretches.
  22. 28 June 2017 Map updated to show work has started on the Eastbourne to Camber stretch.
  23. 21 June 2017 Map updated to show Lulworth Cove to Highcliffe stretch has been split into 2 separate stretches: Lulworth Cove to Kimmeridge Bay and Kimmeridge Bay to Highcliffe.
  24. 19 June 2017 Map updated to show work has started on the Felixstowe Ferry to Bawdsey and Bawdsey to Aldeburgh stretches.
  25. 7 April 2017 Replaced map: work has started on St Mawes to Cremyll; Grain to Gravesend has been extended and renamed Grain to Woolwich.
  26. 31 March 2017 Map updated to show work has started on the Shotley Gate to Felixstowe Ferry stretch.
  27. 27 March 2017 Walney stretch has been approved. Work has started on 2 new stretches in the north west: Cleveleys to Pier Head, Liverpool and Birkenhead to the Welsh border.
  28. 24 March 2017 Map updated: the end point of the Grain to Gravesend stretch was changed in March 2017 from Gravesend in Kent to Woolwich in London in order to join the capital to the England Coast Path along the Thames Estuary.
  29. 13 December 2016 Map updated to show that the Ramsgate to Whitstable stretch has been approved.
  30. 25 November 2016 Map updated; work has now started on the Humber Bridge to Easington stretch
  31. 28 October 2016 Replaced map: work has now started on the Penzance to St Mawes stretch
  32. 24 October 2016 Updated map; Hopton-on-Sea to Sea Palling now open to the public.
  33. 14 October 2016 Work has started on 3 new stretches : Mablethorpe to Humber Bridge; Amble to Bamburgh; Bamburgh to the Scottish Border (including Holy Island).
  34. 23 September 2016 Two new stretches at stage 1: Grain to Gravesend and Isle of Sheppey.
  35. 30 August 2016 Replaced map – work has started on the Shoreham-by-Sea to Eastbourne stretch
  36. 21 July 2016 Replaced map to show that Filey Brigg to Newport Bridge is open to the public and Newport Bridge to North Gare has been approved by the Secretary of State.
  37. 19 July 2016 Replaced map for opening of the path between Folkestone to Ramsgate and Camber to Folkestone.
  38. 1 July 2016 Updated map to show that work has started on the Calshot to Gosport and Gosport to Portsmouth stretches of coast.
  39. 15 March 2016 Replaced map with new version showing that the Brean to Minehead stretch is now open for to the public
  40. 22 February 2016 Replaced map to show that work is in progress on the Silecroft to Silverdale and Silverdale to Cleveleys stretches.
  41. 2 February 2016 Replaced map to update name of Easington to Filey Brigg stretch (was previously Kilnsea to Filey Brigg).
  42. 25 January 2016 Replaced map to show Iwade to Grain stretch as ‘work in progress’ and change to name of the Portsmouth to South Hayling stretch.
  43. 2 December 2015 Replaced map to show change to provisional start date for 3 stretches in the east of England (numbers 35, 36 and 37).
  44. 23 October 2015 Map updated – work has now started on the Highcliffe to Calshot and Lulworth Cove to Highcliffe stretches.
  45. 9 October 2015 Replaced map to show that work has started on stretches of coast in Essex and the south west of England.
  46. 2 October 2015 2 new stretches added: Hunstanton to Sutton Bridge and Aldeburgh to Hopton-on-Sea.
  47. 25 September 2015 3 new stretches started: Gosport to South Hayling, South Hayling to East Head, East Head to Shoreham.
  48. 18 September 2015 2 new stretches started: Skegness to Mablethorpe and Sutton Bridge to Skegness.
  49. 14 August 2015 Added updated map which shows Walney Island and South Bents to Amble stretches as ‘in progress’.
  50. 13 March 2015 New map to show the 2020 programme
  51. 26 June 2014 First published.